Wednesday, 2 July 2008

Substructure blockwork underway






Well, near enough finished, with three courses to the front and four to the back. Contractor didnt use the trenchblock as he had thought he would, but did it all traditionally. There's a big pile of hardcore, or rolled scalpings as they say up here, well scalpings, as they will be rolled later. This will form the solid base and blinded layer on which the insulation and then concrete slab with underfloor heating pipes within will sit. This will be poured on Monday.

These guys don't hang about.