so we have a scraped site. That means the vegetable matter and topsoil has been dug out.
We have a slope front to back which will need a step in the founds, which we will reinforce with steel mesh. thats the whole of the founds, not just the step.
The founds will have been dug out by now, but as I've had a beer, I'm not driving over to look. I was there during this lunchtime, so I'll spin over and take photos tommorrow.
it will be whacked on Monday, inspected by my supervising surveyor, and concrete poured. Will need to sit for three days, then blocks can be laid
WOOOT!
Small issue with the position of the water main, but even though it's Saturday, my contractor has contacted Scottish Water and taken advice which we have acted on.
Saturday, 28 June 2008